Monday 28 April 2014



We have completed turfing one of our nurseries last week, we have tried this out instead of bringing in rootzone then seeding to see how this compares. Other tasks has been to up our cutting programs and hand weed greens

Monday 21 April 2014

 Since we are starting to get growth we are now starting our major aeration work to the Clubhouse putting green of deep hollow coring to take out the heavy soil and replace with sand this will help reduce flooding etc, this will be done in sections to allow continuous play through out the season
 16mm hollow tines set at 8" depth
The Craighead greens were verti-cut then cut to help cut out any lateral growth plus smooth the surface off

Sunday 20 April 2014

 Scores after the first days play of the Battle Trophy
 Course set up first thing. Greens cut, holes changed, tees set up, divoted and bunkers raked

Driving range set up for play off turf

Friday 18 April 2014

 This weekend we are holding the Battle Trophy which is a 72 hole Open strokeplay championship on the Craighead course, so we have been carrying out extra cutting to all areas plus turf ironing greens to help gain a smoother and faster surface, lets hope the wind does not get up too much

 It's that time of year again when we are getting faults/leaks with our irrigation system mostly on the Balcomie course because of the systems age
 the 7th wall all rebuilt and tidy
With the high winds we have been getting this week we are starting to notice old aeration holes/slits starting to open up on the putting surfaces which means time for a little water but not too much

Tuesday 15 April 2014

 Great weather today to be out cutting greens, surrounds & fairways and setting the courses up


 We applied our 2nd application of wetting agent and seaweed behind the greens cutter on the Craighead course this morning
 Marking out our out of bound areas
The wall at the 7th tees on the Balcomie course collapsed at the weekend

Thursday 10 April 2014

 All bunkers on both courses have been cut/blown/cleaned then sand shaped
 After all the drainage lines on the 3rd fairway of the Craighead course were seeded and filled with sand we top-dressed the whole area then it was rubbed in
I attended a talk at the European turfgrass laboratories in Stirling which consisted on how they process and analyse soils etc

Monday 7 April 2014

First cut on our 5th tee on the Balcomie course since it was levelled and re-turfed, hopefully be in play soon

Wednesday 2 April 2014

 After cutting the Balcomie course fairways we applied a granular fertiliser to the weaker fairways to help them through the season

 After the greens were cut and holes changed we applied the start of our wetting agent and seaweed program
Work is still on going on the drainage lines on the Craighead course ie seeding then topping up the lines with sand