Wednesday 31 August 2016

 We have set up our corer with 8mm solid tines to carry out aeration work to the Craighead greens to a depth of 4" then a turf iron with no disturbance to the playing surfaces

 The Balcomie course fairways are getting a cross cut to help cut out any nap from the usual direction of cut of 2 halves
 The new Craighead starters benches have been painted ready to be installed
 With the dry/windy conditions we have been using the irrigation system more which has resulted in the mains pipe at the 8th tee on the Balcomie course springing a leak

No comments:

Post a Comment