Friday 23 September 2016

 This week we continued our aeration work to the surrounds with a 16mm hollow tine to relive compaction and help replace the heavy soil with sand on the Craighead course
 The 4th fairway on the Balcomie course has been cut back 10yards to help reduce the carry from the back medal tee, as this hole usually plays into the prevailing wind
 The Balcomie greens are recovering well from the dry spell

 This year we had 2 members of staff leave to progress with their careers, so we now have John Bowers who worked at Elie GC
and Steven Harris who worked at the Dukes GC joining our team, both have fitted in well

No comments:

Post a Comment